COLD FLARE KNOCK OUT DRUMS (M3-931)



Client is assessing the process of forming head at the site before further work is being done.



Dye-penetration works being made to head to ensure no welding defects in the head 

Installation of shells and heads by using overhead crane.
The tank sized Ø3900 inside diameter and length of the TL-TL 11000. It uses material SA 240 Gr. 304. Each welding joint on the shell and the head will be radiographed.


Gambaran keseluruhan tangi sebelum pemasangan nozzles dan manhole dilakukan.



Hydrostatic testing is underway. Pressure test is 3.5 bar and holding time is one hour and witnessed by the client and a third party.



After hydrostatic test is successful , the tank will be painted according to client specification and all openings are blind and wrapped with stretch film plastic.


The tank is ready for delivery.